specializing in the production of large, medium and small concrete mixers, concrete mixing stations, stabilized soil mixing stations and other equipment. It is a heavy industry enterprise integrating R & production and sales.
t-trench and restoration detail asphalt concrete streets utility pipe/ conduit subgradenote: (6) ("t-cut" limit) trench section cl note: (5) existing or new base material note: (12) tack coat notes: (12 to 15) notes: (1 to 5) equal trench equal t-trench and pavement restoration - asphalt concrete streets gary lee moore, p.e. deputy city ...
Get PriceEmail Inquiryt-trench and restoration detail asphalt concrete streets t-trench and pavement restoration - asphalt concrete streets aurora r. gadbury bertram moklebust electronically signed by edward arrington, s.e. on 06/30/2017 bureau of engineering official record b-4760
Get PriceEmail Inquiry(1) Trench restoration shall be accomplished with a patch or an overlay as required by the Pavement Restoration Requirement Map or the Review Engineer. (2) If a patch is used, the trench limits shall be sawcut prior to final patch.
Get PriceEmail InquiryTrench and Pavement Restoration Page 3 of 3 Updated 12/15/15 Arterial 5 12 803.3 Asphalt Concrete: The aggregate for asphalt concrete shall conform to the grad-ing specified for three-quarter inch (3/4”) maximum aggregate as specified in Sec-tion 39, “Asphalt Concrete,” of the Standard Specifications and in the Special Provi-
Get PriceEmail Inquirynew asphalt cap concrete pavement trench repair and restoration detail asphalt concrete streets new asphalt concrete pavement trench backfill bedding subgrade utility pipe/ conduit native soil existing base materials existing pavement backfill zone pipe/ conduit zone 1 of 2 not to scale 1 sack cement slurry plan no. 12" min 12" min new asphalt ...
Get PriceEmail Inquirynew asphalt cap concrete pavement trench repair and restoration detail asphalt concrete streets new asphalt concrete pavement trench backfill bedding subgrade utility pipe/ conduit native soil existing base materials existing pavement backfill zone pipe/ conduit zone 1 of 2 not to scale 1 sack cement slurry plan no. 12" min 12" min new asphalt ...
Get PriceEmail Inquiry4. Replacing Asphaltic Concrete Pavement on Flexible Base 5. Replacing Penetration Type Pavement on Flexible Base 6. Replacing Special Pavement VII. Restoration Details for Newly Constructed, Reconstructed, or Resurfaced Streets A. Typical Restoration Limits for Asphalt Pavement B. Typical Restoration Limits for Concrete Pavement
Get PriceEmail Inquirytrench repair: use the appropriate 1100s series details for trench repairs: 1100s-2 (flexible base and an asphalt surface), 1100s-3 (concrete or asphalt overlaid concrete), and 1100s-5 (full depth asphalt streets). clsm shall be substituted for
Get PriceEmail InquiryS315LM2 - SURFACE PREPARATION RESTORATION PRIOR TO OVERLAY 2-2-11 .....3-100 S315NM5 ... Asphalt Concrete shall conform to the requirements of Section 211 of the Specifications. ... Open trench in Hydraulic Cement Concrete Pavement should be located at
Get PriceEmail InquiryTrench Pavement Restoration Detail Poured Monument in Place Detail Surface Monument Detail Sight Obstruction Detail Sight Distance Continued Detail (2 pages) Sidewalk without Planting Strip Detail Sidewalk with Planting Strip Detail Cement Concrete Driveway without Planter Detail Cement Concrete Driveway with Planter Detail
Get PriceEmail InquiryMar 14, 2019 Standard Plan SP-477-2 - T-Trench and Pavement Restoration - Asphalt Concrete Streets Skip to main content LOS ANGELES 311 City ... T-Trench and Pavement Restoration - Asphalt Concrete Streets. Revised on 03-14-2019 . Share this link. Send by email. Message. Send. Comments.
Get PriceEmail Inquiryconcrete surfaced streets trench resurfacing for asphalt sdg-107 c updated ka j. nagelvoort 4/13 6" typical c c c c 1 1/2" c c c c c c c c c c updated bb j. nagelvoort 1/4 updated ls j. nagelvoort 02/16 type 1 type 2 12.0" 10.0" 8.0" 3/4" type iii class b3 asphalt combined asphalt plus base 18" min. existing plus 1", min 4" to max. 9". asphalt ...
Get PriceEmail InquiryTitle: Trench and Pavement Restoration Policy 04242014 Author: lsalinas Created Date: 4/24/2014 2:49:28 PM
Get PriceEmail Inquiryconcrete base existing ground existing ground pipe standard trench section as required by plans and specifications pavement sawcut - trench section (typical) sawcut full lane width or min 10' 1' min 1' min 1' min scale: 1" =1' revised 02/12/12 by jmk j:\citydwg\civil 3d drawings\dtl\city sdds\pavement sawcut-trench section detail.pdf
Get PriceEmail InquiryFigure C - 9. Full Depth Rigid Pavement Slab Repair Detail - Section 88 . September 28, 2007 AC 150/5380-6B Appendix C ... Concrete Pavement Repair Manual, JP002P, American Concrete Pavement Association, Skokie, IL, ... SHRP H 348 Asphalt Pavement Repair Manuals of Practice, Materials and Procedures for Sealing ...
Get PriceEmail Inquiry28. h-1042a standard trench or hole restoration in accordance with local law no. 14 29. h-1042b concrete pavement restoration 30. h-1042c roadway restoration for newly constructed roadways 31. h-1043 steel faced curb steel facing type d for structures 32. h1044 concrete curb 33. h-1045 concrete sidewalk 34. h-1046 street tree planting detail ...
Get PriceEmail InquiryIn addition to asphalt maintenance, repair and construction, we can also carry out minor drainage works, landscaping to support asphalt works, earthworks and the disposal of surplus spoil. On that note, whether you are in the commercial, residential, industrial or government sector, you can rely on our team of bitumen and asphalt experts to get ...
Get PriceEmail InquiryTable of Contents • 400 Hot Mix Asphaltic Concrete Construction • 401 Cold Mix for Patching • 402 Hot Mix Recycled Asphaltic Concrete • 403 Hot In-Place Recycled Asphaltic Concrete • 405 Hot Asphalt-Vulcanized Rubber Seal Treatment • 407 Asphalt-Rubber Joint and Crack Seal • 411 Asphaltic Concrete Pavement, Partial Removal • 412 Bituminous Prime
Get PriceEmail InquiryChapter 3 Pavement Patching and Repair Page 3-6 WSDOT Maintenance Manual M 51-01.11 September 2020 3-6 HATS In order to properly document areas of pavement repair need and prepare for work to be completed, a system of mapping pavement distress for planned activities has to be in place.
Get PriceEmail InquiryS315LM2 - SURFACE PREPARATION RESTORATION PRIOR TO OVERLAY 2-2-11 .....3-100 S315NM5 ... Asphalt Concrete shall conform to the requirements of Section 211 of the Specifications. ... Open trench in Hydraulic Cement Concrete Pavement should be located at
Get PriceEmail InquiryAfter the repair is completed, the pavement patch effectively bridges the utility trench, and the ends of the patch rest on the original base on either side of the trench. When shown in a cross-section, the patch and the trench together form a T shape. Cross-section of a pavement structure showing T-section patch technique.
Get PriceEmail Inquiry5.2 Asphalt Concrete 5.3 Base Material 5.4 Grading Equipment Track Equipment Paving Equipment 6. TRENCHING Cal OSHA New Roads 6.3 Depth of Installation Separation of Utilities Pavement Removal Open Trench 6.7 Trench Bridging 6.8 Protective Fencing Trench Backfill 6.10 Narrow Trench 6.11 Boring (Jacking) Pits and Potholes Inclement Weather
Get PriceEmail InquiryOct 01, 2016 02/01/2009. 19. Gate Valve with Box Detail. 05/21/2020. 20. Temporary Line-Size Blow-Off for Raw, Reclaimed and Potable Water Mains Detail. 06/01/2010. 21. Temporary 2" Blow-Off/Sampling Arrangement for Raw, Reclaimed and Potable Water Mains Detail.
Get PriceEmail InquiryApr 01, 2017 19. The trench to be backfilled shall be made as dry as practicable at the time of backfilling by pumping, bailing, draining, or other approved dewatering method. 20. All asphalt pavement restoration activities shall be in accordance with the Asphalt Pavement Restoration Detail for Open Cut Utility Installations contained herein.
Get PriceEmail Inquiryrestored with asphalt or full concrete panels. F. When a trench excavation affects less than 25% of the length of a block, the asphalt must be restored the full width of the affected lane and beyond the edges of the concrete base and must be straight-lined and contiguous. G. When a trench excavation affects more than 25% of the length
Get PriceEmail InquiryRepaving of trenched areas must be in accordance with Section 23, “Asphalt Concrete,” and Standard Drawing 4-64, of these Specifications. 14-3.01 Trench Restoration Edges of trench restoration must be cut/ground so that edges are parallel or
Get PriceEmail InquiryTitle: Trench and Pavement Restoration Policy 04242014 Author: lsalinas Created Date: 4/24/2014 2:49:28 PM
Get PriceEmail Inquirypavement repair detail january 2009 revision 1. notes 1. all concrete and asphalt pavement, including driveways, to be cut with a sawcut a minimum depth of 3". 3. all pavement repairs are subject to approval by the town of mooresville or ncdot as applicable. 4. 12-inch minimum cut outside trench is also required for sloped walls. 5.
Get PriceEmail Inquiryfull depth repair roadway or sidewalk excavations asphalt pavement restoration sidewalk or temporary pipe or other structure clsm, item 204.01 623.12 (not crusher run) washed no.2 stone, item d. the water/cement ratio shall be 0.36-0.40. c. there shall be no sand in the clsm mix design. no fly ash (item 204.02).
Get PriceEmail Inquiry8. Concrete surface to be rough for bonding of asphalt if area is to be resurfaced. Trench to be completed before ASPHALT PAVEMENT CONCRETE PAVEMENT ASPHALT ASPHALT 12" CLSM TO BE ROUGH FOR BONDING OF ASPHALT COMPOSITE PAVEMENT MATERIAL MATERIAL 1" 5/8 "JOINT HOT POURED ELASTIC TYPE SEALER IN ACCORDANCE WITH
Get PriceEmail Inquiry28. h-1042a standard trench or hole restoration in accordance with local law no. 14 29. h-1042b concrete pavement restoration 30. h-1042c roadway restoration for newly constructed roadways 31. h-1043 steel faced curb steel facing type d for structures 32. h1044 concrete curb 33. h-1045 concrete sidewalk 34. h-1046 street tree planting detail ...
Get PriceEmail Inquiry8) Alley Pavement Restoration A-2-8 9) P.C.C. Alley Pavement Restoration, Pipe or Conduit Trench Detail, A-2-9 Concrete Alley 10)Alley pavement Restoration, Pipe or Conduit Trench Detail, A-2-10 Asphalt Alley 11)Portland Cement Concrete Alley A-2-11 12)Detail of Structure Casting Isolation Box A-2-12A and A-12-12B
Get PriceEmail InquirySection 710: Asphalt Concrete Section 717: Asphalt-Rubber Asphalt Concrete • Section 735: Reinforced Concrete Pipe • Section 771: Galvanizing Section 772: Chain Link Fence Specifications that have been deleted: Section 744: ABS Truss Pipe and Fittings • Detail 145: SAFETY RAIL • Detail 200-1: TRENCH BACKFILL AND SURFACE REPLACEMENT
Get PriceEmail InquiryStandard Construction Details. The Monroe County Standard Details are used to detail work done within the County Right of Way. The details are to be used by consultants, developers, utilities and homeowners for work on County highways and bridges, and any permitted work done within the County Right of Way.
Get PriceEmail Inquiryshafts and concrete surfaces shall be gwen a tack coat per 302—5.4 before permanent asphalt trench resurfacing is placed. case i and il trench resurfacing shall consist of an asphalt concrete surface course of c2 pg 64-10 over an an asphalt concrete base course of type b pg 64—10. where the original asphalt
Get PriceEmail InquiryTable of Contents • 400 Hot Mix Asphaltic Concrete Construction • 401 Cold Mix for Patching • 402 Hot Mix Recycled Asphaltic Concrete • 403 Hot In-Place Recycled Asphaltic Concrete • 405 Hot Asphalt-Vulcanized Rubber Seal Treatment • 407 Asphalt-Rubber Joint and Crack Seal • 411 Asphaltic Concrete Pavement, Partial Removal • 412 Bituminous Prime
Get PriceEmail InquiryOct 01, 2016 02/01/2009. 19. Gate Valve with Box Detail. 05/21/2020. 20. Temporary Line-Size Blow-Off for Raw, Reclaimed and Potable Water Mains Detail. 06/01/2010. 21. Temporary 2" Blow-Off/Sampling Arrangement for Raw, Reclaimed and Potable Water Mains Detail.
Get PriceEmail Inquiry• Specifications and Construction Guidelines for Trench Repair D.2 CURRENT PRACTICES IN MPW In 1997, MPW amended Chapter 13.20, Excavations and Obstructions, of the Metropolitan Code of Laws in an attempt to increase the service life of the MPW's pavement network. This amendment, enacted through Ordinance 97-785, Excavations and Obstructions,
Get PriceEmail Inquiry